CGConstructivegroup.az
Aerial view of a highway interchange
Проект

North Ring Highway Expansion

38 km of dual-carriageway highway with four grade-separated interchanges, cutting regional freight transit time by 40%.

Обзор

This EPC highway project delivered 38 km of new dual carriageway and four grade-separated interchanges, forming a critical link in the national freight corridor.

Задачи

The alignment crossed three active rail lines and two protected wetland areas.

Наши решения

Purpose-built rail crossings were sequenced around freight windows, and a dedicated environmental monitoring team supervised wetland mitigation works throughout construction.

Технологии и методы

GPS Machine Control GradingPrecast Bridge SegmentsEnvironmental Monitoring Sensors

Хронология проекта

    Q1 2021

    Earthworks commenced

    Q3 2022

    First interchange opened

    Q3 2023

    Full corridor opened to traffic

Галерея

Construction site at dusk with cranes silhouetted

Есть идея проекта?

Расскажите нам о своём видении — наша команда ответит в течение одного рабочего дня с дальнейшими шагами.

Начать разговор