CGConstructivegroup.az
Aerial view of a highway interchange
Layihə

North Ring Highway Expansion

38 km of dual-carriageway highway with four grade-separated interchanges, cutting regional freight transit time by 40%.

Ümumi Baxış

This EPC highway project delivered 38 km of new dual carriageway and four grade-separated interchanges, forming a critical link in the national freight corridor.

Çətinliklər

The alignment crossed three active rail lines and two protected wetland areas.

Həllərimiz

Purpose-built rail crossings were sequenced around freight windows, and a dedicated environmental monitoring team supervised wetland mitigation works throughout construction.

Texnologiya və Metodlar

GPS Machine Control GradingPrecast Bridge SegmentsEnvironmental Monitoring Sensors

Layihə Xronologiyası

    Q1 2021

    Earthworks commenced

    Q3 2022

    First interchange opened

    Q3 2023

    Full corridor opened to traffic

Qalereya

Construction site at dusk with cranes silhouetted

Layihə fikriniz var?

Görüntünüz haqqında bizə danışın — komandamız bir iş günü ərzində növbəti addımlarla cavab verəcək.

Söhbətə Başlayın